ÖBB Wienerwald

Project launch:
April 2008

Duration:
9 months
 

Project overview

Overall length:

  • Section Wienerwald: 14,4 km
  • Tunnel: 13,3 km

Turnouts are situated on slab track and mounted on spring systems.

16 Turnouts

  • 1 crossing 1:9
  • 7x 2600/1600-1:24 HBS-HB (FF)
  • 5x 1200-1:18,5 HBS-HB
  • 4x 500-1:12 HBS-HB