Skip to main content

BLT Railway Systems Installation

Project Launch

2006, in Depot Hüslimatt, Basel-Oberwil

Project Status:
Since 2008 the system is working completely failure-free.

Project Overview

  • 16 ea electrical switch machines CSV 24
  • 1 ea manual switch machine CSV 34
  • Control system TCS 300
  • 1 central control station with TCS Visio
  • Unilight LED signals and matrix signals
  • Route request panels have been installed in the depot