Corporate Blog
voestalpine AG

greentec steel

With our research activities, technologies and innovations related to greentec steel, we are making a significant long-term contribution to achieving the climate goals. In a first step towards green steel production, we are planning to reduce our CO2 emissions by up to 30% by 2029 – that is almost 5% of Austria’s annual CO2 emissions. greentec steel is thus the largest climate protection program in Austria.

A greentec steel conveyor bridge at the voestalpine site in Linz, with industrial facilities, pipelines, and buildings in the background.
Ab 2027 gehören Eisenbriketts (Hot Briquetted Iron, HBI) zu den grundlegenden Einsatzstoffen unseres Elektrolichtbogenofens in Linz. Damit er kontinuierlich beschickt werden kann, wird am Standort Linz eine entsprechende Versorgungsanlage errichtet.
2
Microtunnel-Baustelle mit großem Vortriebsrohr, Hydraulikzylindern und technischen Leitungen in einer Betonschachtanlage.
Der Microtunnel zur Stromversorgung des neuen Elektrolichtbogenofens am Standort Linz ist fertiggestellt. Damit kommen wir auch unterirdisch unserem Ziel näher: der Transformation der Stahlproduktion im Rahmen von greentec steel.
3
Rohrpostleitung auf einem Industrieareal mit oberirdisch geführten Rohren, Stahlkonstruktionen und Gebäuden im Hintergrund.
Ein kilometerlanges Rohrpostsystem unterstützt uns am Standort Linz seit mehr als drei Jahrzehnten. Es verbindet Anlagen unserer Fertigung in der greentec steel Edition mit dem zentralen Prüflabor. So sichern wir die Qualität unserer nachhaltigsten Stahl-Edition.
2