Corporate Blog
voestalpine AG

Career

As a globally active steel and technology group, voestalpine is an attractive employer with a wide range of career opportunities. Around 50,000 employees work in 500 Group companies worldwide.

Michael’s #FavoriteMoments: With high-tech and heart for more rail safety
Michael and his team produce safety systems for railroads. With the help of built-in sensors, current and impending problems on the train are detected. This makes rail travel even safer and more punctual. Since the opening of the new voestalpine production and warehouse building at the Siershahn site, he and his team have been particularly […]
4
Julia’s #FavoriteMoments: Working around the world for safe trains
Julia loves technology and provides service, support and training to ensure that our systems for a safe rail infrastructure not only work flawlessly, but perfectly. As an electronics technician, she is in constant contact with her colleagues and the team is always on hand to help with detailed questions. This works best with respectful and […]
3

greentec steel

Smart scrap sorting for green steel
Due to the switch to green steel production, significantly more scrap will be required in the future, so the sufficient availability of scrap will play an important role. For this reason, we are already conducting research in various projects into how high-quality steel grades can be produced from old scrap in the future.
4
Steel cycle: How scrap is turned into green steel
The conversion to “green” steel production means that significantly more scrap will be needed in the future. However, this increasing demand cannot be fully covered by new scrap (pre-consumer scrap). In future, it will therefore be necessary to make greater use of old scrap (post-consumer scrap), which has to be processed and sorted at great […]
6
greentec steel: building progress above and below ground
At voestalpine, we are building bridges and tunnels as part of greentec steel, our program for the conversion to steel production with net zero CO2-emissions. The new 800 meter-long conveyor belt bridge that will also supply the electric arc furnace with raw materials from 2027 onwards was recently completed.
3