Corporate Blog
voestalpine AG

Working environments

We as voestalpine offer numerous professional options and career opportunities and works continually at offering our employees an attractive work environment. Fundamentally, this is based on an appreciative corporate culture.

ICE Schnellzug während der Fahrt auf einer zweigleisigen Strecke
Millions of people worldwide use trains as a fast and safe mode of transportation. They discover new destinations and enjoy eco-friendly mobility on the rails in their daily lives. A visit with four of our employees in Japan, Austria, Mexico, and Brazil offers insight into why they choose trains as their preferred mode of transportation […]
1
Joyce from voestalpine is standing in a restroom, smiling, and holding a piece of paper in her hand.
Joyce is someone who always stays on top of things. At our Villares Metals S.A. facility in Brazil, she ensures quality and safety at the Service & Solution Center. What drives her? Quality assurance in her department, customer satisfaction, and a beautiful world full of travel and experiences.
4

greentec steel

Microtunnel-Baustelle mit großem Vortriebsrohr, Hydraulikzylindern und technischen Leitungen in einer Betonschachtanlage.
The microtunnel supplying power to the new electric arc furnace at the Linz site has been completed. This brings us one step closer to our goal—even underground—of transforming steel production as part of greentec steel.
3
Rohrpostleitung auf einem Industrieareal mit oberirdisch geführten Rohren, Stahlkonstruktionen und Gebäuden im Hintergrund.
A kilometer-long pneumatic tube system has been supporting us at our Linz site for more than three decades. It connects the production facilities of our greentec steel Edition with the central testing laboratory. This is how we ensure the quality of our most sustainable steel edition.
2
Linz Elektrostahlwerk Industrial Construction Site: Steel structures, cranes, and construction work on a large production facility.
With greentec steel, we are laying the groundwork for a new, low-carbon steel production process at our Linz site and are building and expanding the necessary infrastructure. While operations continue, work is currently underway on more than 20 individual projects simultaneously—a feat of engineering unique in Europe.
3