OEBB Turnouts Installation

Project Launch

  • April 2008 in Austria
  • Duration: 9 months

Project Overview

Overall Length:

  • Section Wienerwald: 14,4 km
  • Tunnel: 13,3 km

16 Turnouts:

  • 1 crossing 1:9
  • 7x 2600/1600-1:24 HBS-HB (FF)
  • 5x 1200-1:18,5 HBS-HB
  • 4x 500-1:12 HBS-HB

Turnouts are situated on ballastless track and mounted on spring systems.