Corporate Blog
voestalpine AG

Railways

As voestalpine, we are the global market leader in system solutions for railway infrastructure. As a full-service provider, we offer high-quality products and services for rails, turnouts, signaling technology and monitoring applications.

State-of-the-art camera analysis improves railroad safety
In a cross-divisional pilot project, voestalpine Signaling Siershahn GmbH—a subsidiary of voestalpine Railway Systems, the global leader for railway infrastructure system solutions—and Logistik Service GmbH (LogServ) are developing a state-of-the-art Visual Train Analysis system: innovative camera analysis for moving wagons.
4
Sustainable: travel well with voestalpine
Trains are the most ecological way to travel. When it comes to sustainability and emissions avoidance, no other method of transport can surpass the railways. voestalpine companies offer premium products and services to railway operators worldwide.
5
voestalpine and ÖBB bring digital rolling stock  monitoring on track
Where once trains pulling into a railway station were manually or visually checked by the dispatcher , today digital sensors monitor key components such as the wheels, brakes, and bearings, as well as wagon loads. By 2023 voestalpine Railway Systems will have equipped Austria’s rail network with 47 digital checkpoints, creating a nationwide train and […]
4

greentec steel

Donawitz: the team behind greentec steel
The entire project team is already caught up in the excitement of greentec steel, and not just in Linz. As part of Austria’s largest climate protection program and voestalpine’s most extensive investment project to date, a fresh, green steel wind is now also blowing at the site in Donawitz. It is a megaproject, one that […]
3
greentec steel: the people behind the megaproject
Austria’s largest climate protection program and the most extensive investment project in our company’s history: greentec steel. A project only made possible thanks to the people behind it. Read on to learn more about the members of the project team in Linz.
3