8 January 2021
Another successful test with our dust suppressing ballast train in Germany
Twelve wagons with nearly 300 tons of ballast unloaded in less than 30 minutes. The second test with our dust suppressing ballast train (or in Dutch called the SALT) , this time executed in the Hönebach Tunnel nearby Kassel in Germany, was another great success.
Another successful test with our dust suppressing ballast train in Germany