At voestalpine, we are building bridges and tunnels as part of greentec steel, our program for the conversion to carbon-neutral steel production. The new 800 meter-long conveyor belt bridge that will also supply the electric arc furnace with raw materials from 2027 onwards was recently completed.
14 Mar, 2024