Drilling, casing, tubing: the three phases of a wellbore

Drilling, casing, tubing: the three phases of a wellbore

Production of oil or gas is a complex, time- and cost-intensive undertaking, but in principle, every wellbore goes through three phases.

a drilling rig in the middle of a field
""
In this article

1. Drilling with drill pipes

Drill pipes are durable steel pipes that conduct the force to the drill bit. In many cases the drill pipe turns the drill bit, which cuts into the rock until it reaches the deposits. The last drill pipes before the drill bit are often nonmagnetic drill collars, particularly in horizontal drilling. Drilling with drill pipe is the first phase of every wellbore. Drilling mud meanwhile cools the drill bit and carries the rock cuttings, i.e. the cut rock, back to the surface.

2. Lining with casing

The outer tubes are called casing. Casing lines the wellbore and thus protects the layers of soil and above all the groundwater from being contaminated by the drilling mud and/or frac fluids. It also stabilizes the wellbore, so casing must be able to withstand especially high loads. The drilling and casing alternate – the drill string is taken out at specific intervals and the wellbore is lined with casing and cemented. Then drilling continues.

3. Production with tubing

Tubing transports the oil and gas from deep in the well to the surface – the third phase of the wellbore. Oil and gas occasionally rise to the surface on their own; usually, pumps are needed to bring the fluids to the surface.
Tubing naturally has a smaller diameter than casing, except for the 4 1/2-inch diameter. An outer diameter of 114.3 mm (4 1/2 inches) is considered a threshold and can be either casing or tubing. Anything smaller is called tubing, anything larger is casing.
From the surface to the bottom of the well, the casing telescopes down in size – there are various types of casing depending on their purpose and diameter. The “kickoff point” is where the wellbore gradually transitions from vertical to horizontal. Thanks to horizontal drilling, deposits can be reached in a more targeted way. At the conclusion, the drill string is removed and the production casing is inserted into the wellbore and cemented into place. The well is then fractured and the tubing is installed inside the production casing.
More information: voestalpine Tubulars: Products for the Oil & Gas industry

""
Share article
GreenTec Steel

Austria's biggest climate protection program

More info
voestalpine AG

voestalpine AG

Die voestalpine ist ein weltweit führender Stahl- und Technologiekonzern mit kombinierter Werkstoff- und Verarbeitungskompetenz. Die global tätige Unternehmensgruppe verfügt über rund 500 Konzerngesellschaften und -standorte in mehr als 50 Ländern auf allen fünf Kontinenten. Sie notiert seit 1995 an der Wiener Börse. Mit ihren Premium-Produkt- und Systemlösungen zählt sie zu den führenden Partnern der Automobil- und Hausgeräteindustrie sowie der Luftfahrt- und Öl- & Gasindustrie und ist darüber hinaus Weltmarktführer bei Bahninfrastruktursystemen, bei Werkzeugstahl und Spezialprofilen. Die voestalpine bekennt sich zu den globalen Klimazielen und verfolgt mit greentec steel einen klaren Plan zur Dekarbonisierung der Stahlproduktion.