FGV - Tram Alicante

Project:
Depot Alicante, Spain
 

Project overview

  • 32 electric switch machines CSV 24
    thereof 14 installed beside the track
  • 1 CSV 34 with detector rods installed operating in automatic return mode
  • Turnouts manufactured by JEZ
  • Gauge 1000 mm