BLT Basle County Transport AG

Project:
Depot Hüslimatt, Basel-Oberwil

Project launch:
2006

Project status:
Since 2008 the system is working completely failure-free.
 

Project overview

  • 16 ea electrical switch machines CSV 24
  • 1 ea manual switch machine CSV 34
  • Control system TCS 300
  • 1 central control station with TCS Visio
  • Unilight LED signals and matrix signals
  • Route request panels have been installed in the depot