Skip to main content

HL Turnout Installations

Project Launch

Start of supplies in 2010 in South Korea

Contract closing: February 2009

Quantity of orders: approx. 3,3 mEUR

Project Overview

37 turnouts:

  • 29 turnouts 60-1200-1:15,5 (F18) 
  • 8 turnouts 60-10000/4000 (F46)
  • Turnouts were shipped by BWG to two contruction businesses DDU Gomo
  • Accompanying setting systems (HYDROSTAR®)
    with IE 2010) were shipped by VAEE FOB Antwerp to Samsung SDS

Project End

Last shipment according to main contract in 2011

We endeavor to ensure a long and unhindered life cycle of turnouts and track components right from the beginning. For our turnouts, the service starts as soon as it leaves our factory.

Professional installation support comprises monitoring of transport and logistics, technical consulting and quality assurance as well as installation check, including required documentation.