KB2 RH1b Long-Span Driven

Soil-driven over a span of 3 cells

Due to its flat-gradient, this soil-driving method is used for the beginning of the guardrail structure in the direction of the traffic flow.

English version of the technical type sheet will be available in a few weeks !!!


Open preview picture of file
Typenblatt D211